Frame house 6x8 projects with furnace. Frame house and stove. Examples of interesting layouts of houses with stove heating

Depending on the purpose, houses can be either small, designed for temporary residence and seasonal recreation, or spacious - for permanent residence families. Options with two entrances are also possible; such houses are equipped with two entrances. They require additional insulation and sound insulation, construction of a durable foundation, and communications.

Small garden or country house 6x6 is suitable for placement in a small area, and square shape allows you to reduce costs not only on materials, but also on heating. Small sizes the houses are not conducive to use as permanent housing, so there will be no costs for additional insulation construction or use of expensive materials. Another plus is that the foundation is quite inexpensive to build. Inner space can be divided into a living room and a small utility room.

A bathroom in a private house provides comfortable living. The complex of premises - bathroom, shower, toilet - is designed depending on the area of ​​the house, its type, and the wishes of the owners. There are rules for the location of bathrooms in private houses, according to which: the bathroom cannot be located above the kitchen and living rooms, you cannot combine a restroom with these rooms. IN wooden houses To accommodate a bathroom, sliding frames are often installed so that the finishing and communications are not damaged by wood shrinkage.

About Us

The construction company "House Quality" is constructing country houses, cottages and baths since 2001. We have vast experience in implementing the most complex projects. We guarantee a responsible approach to construction, regardless of the chosen budget plan.

Our company in numbers

For more than 15 years of activity, we have a lot to be proud of:

  • 70% of the 1,200 commissioned properties are used for permanent residence;
  • over 900 satisfied clients, of which about 300 returned;
  • 36 construction teams specializing in the construction of timber buildings;
  • 23 units of special equipment in the fleet, which ensures cost reduction;
  • 2 logging plants equipped drying chambers;
  • 1 own plot in the Novgorod region.

Our advantages

  • Our own production, which allows you to not depend on suppliers, meet deadlines and offer affordable prices;
  • Experienced crews, polite and non-drinking builders, time-tested;
  • The presence of designers on the company's staff - any of your ideas is under strict technical control;
  • Our own fleet of vehicles saves time and cost of delivery of house kits;
  • Individual approach to each of your tasks.

150x150 150x200 200x200 145x145 145x195 195x195

BASIC EQUIPMENT OF A SHRINKABLE HOUSE FROM NATURAL HUMIDITY MATERIAL (INCLUDING ASSEMBLY AND DELIVERY):

  • Log house - timber 150x150 mm (1st and 2nd floor).
  • All partitions are 100x150 mm timber (1st and 2nd floor).
  • Raising the walls of the second floor is 1.2 m.
  • Floor and ceiling beams - timber 100x150 mm. (after 59 cm to the size of the insulation).
  • The roof gables are timber 150x150 mm (height 2.6 m).
  • The rafter system is a board 50x150 mm (59 cm below the size of the insulation).
  • Roof outlets of at least 50 cm.
  • Roof sheathing – board 25x150 mm.
  • Roof covering with roofing felt.
  • Treatment lower crown and genital lags with an antiseptic.
  • The clear height of the 1st floor is 2.7 m (+/- 5 cm clear from beam to beam).
  • The clear height of the 2nd floor is 2.5 m (+/- 5 cm clear from the beam to the ceiling crossbar).
  • All Consumables(wooden dowels, flax fiber (jute), nails, staples, roofing felt).
  • Free delivery within the Moscow region and up to 600 km from our production base.
  • Assembling the walls of the log house on wooden dowels (dowels);
  • Chopping corner connections in a dovetail (warm corner)
  • Installation of windows, doors, flooring, stairs and roof insulation is carried out after 6-7 months (after complete shrinkage of the log house) and is not included in the package.
  • Cleaning waste inside and outside the building into separate piles.
Service Description Price
Strapping beam for pile foundation Serves as a tie for piles and support for floor beams 150x200 18000 rub.
Subfloor on 1st floor Edged board 25x100-150mm 17000 rub.
Subfloor on 2nd floor Edged board 25x100-150mm 17000 rub.
Additional crown Increasing the height of log ceilings On request
Replacement internal partitions Increase in thickness from 100 to 150 mm On request
Replacement of genital and ceiling beams from 100x150 mm at 100x200 mm 1st floor On request
at 100x200 mm 2nd floor On request
Generator rental Provided if there is no electricity on site, only gasoline is paid for for free
Construction shed size 2x4 In the absence of housing for builders (after construction it remains with the customer) 18,000 rub.
Profiled timber "for a block house" Rounding outside profiled timber of any section. For free
Mirroring a Project For free
changing the project without increasing the material For free

Select the construction location on the map and the delivery cost will be calculated automatically

View dimensions

View dimensions

STAGES OF COOPERATION

First contact.
We discuss basic issues by phone or email.

We coordinate construction details on site. It is important for us to know the location of the house on the site and the access route to it.

Signing the contract.
We draw up a transparent contract. Prepayment 1% - 5%.

Delivery of the house kit to the site, arrival of the team. After unloading, 74% of the cost is paid.

Construction of a house.
The construction period for a house "for shrinkage" is 14 - 30 days, depending on the object.

Acceptance and guarantees.
Signing the acceptance certificate and paying the remaining 25%. 3 year warranty.

Project description:

A 6x8 house project with a turnkey boiler room offers inexpensive purchase construction company“Kostroma Plotnik”. Comfortable house with a total area of ​​98.2 sq. m will be for you ideal option both for recreation and for living. A special feature of the project is the presence of its own boiler room, thanks to which you will be able to maintain optimal temperature in all rooms.

A terrace was designed for the entrance to the house made of 6 by 8 timber, after which there is a hall (12.1 m2). To the right of the hall there is a bathroom and a boiler room, and to the left is a living room (17.0 m2), the area of ​​which is increased due to the attached bay window. Next to the living room there is a kitchen-dining room (10.4 m2). On the upper level there are two rooms with an area of ​​21.7 m2 each.

DO YOU HAVE YOUR OWN PRODUCTION?

Yes, we have own production. We are engaged in the procurement and production of lumber of any section. We also directly engage in felling of log houses. different types(“bowl”, “in the paw”, sharpening a log for a plane, as well as for a scraper).

HOW LONG HAVE YOU BEEN ON THE MARKET?

“KostromaPlotnik” has been working in its field for 5 years and already has a good reputation for the quality of service, work and material supply.

WHY YOUR COMPANY?

I want to answer you as the head of the company. We bear great responsibility for the material we supply and its installation. We give a guarantee on houses. We employ only Russians, professionals in their field (which is not at all important). We love to build houses, we love to work and communicate with people. We have optimal prices for the construction of houses. Often people only look at the cost of the job and not the quality. I can give an example of such a situation. Some time ago there was a call from the Customer. He was very upset. He started the first construction - a bathhouse. The customer was looking for cheap option and found it. The bathhouse arrived incompletely equipped. Even workers were not provided for the construction. Although everything was spelled out in the contract. The quality of the cutting itself was disgusting. Having called the company, they simply answered: “What you ordered is what you received.” After this, the Customer contacted us. He was given a brigade. Arriving at the place, the guys were shocked by what they saw. As they say: “I wish I could tear off these masters’ hands.” This is what the low price and attitude to work indicate. Advice for the future, always think about your decision! As for the Customer, my workers assembled a good bathhouse. A year later, he ordered a good, solid house from us.

The one who decided to build own house, often does not know where to start. But planning the rooms is far from the very first step in the process of building a home. Before developing a project or drawing up a detailed work plan, it is necessary to answer the following questions: what is the overall living space future home; will it be heated? if so, how? The subsequent stages of construction depend on the answers to them.

Layout one-story house with stove 6×8

The 6x6 building is most likely a country house, in which it is possible to live not all year round, but only in the warm season. Therefore, its layout is simple due to its small footprint. Its drawing is also simple due to the lack of a heating system. And for year-round use, buildings are built that are more spacious, for example, and larger. But then stove heating is simply necessary.

However, a construction company can offer a heating system. It will include general and detailed plan construction. The customer who wishes to have a house with a stove can make his own amendments, which will be immediately taken into account by the contractor. This option is called custom construction.

The client can order from the company not only a finished project, but also the construction standard house with already resolved planning issues.

Option internal layout and the location of the stove in the house

If the customer fully accepts the proposed plan, then construction will cost him much less.

Advantages

When the layout is well thought out taking into account a specific heating system, the installation of the stove practically does not depend on the building material from which the home is built. It is suitable for both wooden and brick house. Its advantage is that for space heating there is always wide choose fuels: coal, peat, firewood, even cardboard and dry tree branches. The user himself decides what to heat with, what is more accessible and costs less.

Heating with electricity is more expensive, and not all residential areas are equipped with a gas pipeline.

The next advantage is that heating the house does not depend on heating season heating plants, from emergency repairs and long-term interruptions in fuel supplies. The stove is autonomous, its operating mode is determined by the user himself, who does not need a plan for seasonal system shutdowns.

Layout of a house with a stove 6×9 meters

The ability of a stove to create a cozy and comfortable atmosphere is well known. Thanks to this quality, no other heating system can compare with it. It’s nice to sit with a book by the stove, inhale the smell of resinous wood and listen to its quiet crackling. This is reminiscent of distant times, shrouded in romance. In addition to these advantages, the stove can be equipped so that it becomes an original addition to the interior.

Read also

Layout of a spacious 10x10 house for a large family

The Russian stove gives the room a special charm. In terms of heat capacity, nothing can compare with it. It is able to accumulate heat and then gradually release it, maintaining constant coziness and comfort in the hut. In the past, it performed a cooking and heating function. Today it is quite rare.

Only those who like the rustic design style of the house will decide to decorate their apartments with it. True, there are no more stove makers who don’t need a drawing to build one. But recently, a house project with a fireplace has been a common proposal from construction companies. This fashionable heating device provides heat, but does not store any heat. Used more as a decorative element.

Century technical progress made some adjustments. Today, it is common to have a house with a stove that runs not only on solid fuel, but also on electricity, gas, and fuel oil. But most available material the heating is still wood.

Installation and operation rules

Shape, appearance the furnace is fixed by its drawing. Many people try to install it somewhere in a corner so that it doesn’t bother anyone or take up much space. But this is not the main installation criterion. As a rule, its most rational location is reflected in every heated house project developed by the company.

In, as well as in or in, it is preferable to place the furnace structure in the very center.

Detailed house plan with 8x8 fireplace stove

Then the effect from it will be greatest, because it will successfully warm up all the rooms. As practice has shown, there is no way to install it in outer wall so as not to heat the street.

If the home plan is furnace system designed professionally, then after its implementation it will be warm and cozy even all year round. It is recommended to plan the stove in suburban or no higher than two-story buildings. If it is still cool on the second floor, then some residents close it for the winter, living only on the well-heated first floor.

Read also

Holiday houses or guest places on your site

Very important rule: a house with a stove must have effective thermal protection. Otherwise, all efforts to heat it will be in vain. A cash to buy fuel will literally go down the drain. You should not skimp on insulating your home. True, not a single company will offer a house design without thermal insulation. But if its layout is centralized system heating, then such a construction plan is not suitable for installing a stove.

Layout Finnish house with oven size 6x6

It is a mistake to think that if you install a powerful stove in a small building, for example, 6x6, then it will be sufficient for heating a small amount of firewood This is not true at all. All of them will go only to slightly warm it up. And the rooms will remain cold. Each house with a stove is equipped with a heating structure corresponding to the space it is intended to heat. So, if the home is 6x9, then heating design should be more heat-intensive.

Another important rule that should not be neglected is installing the stove on a separate foundation. It cannot be the same for her and for the whole house. This should be clearly demonstrated both by the general design of the dwelling and by a separate drawing of the firebox structure.

Detailed drawing of a log house with a stove size 5x6

The fact is that the soil sags differently under different weights. As a result, the stove may become warped and cracks will appear. As a result, not only heat will enter the rooms, but also smoke and carbon monoxide.

Knowing the installation rules, you should not forget about the rules of use. A house with a stove requires strict compliance with regulations fire safety. And it doesn’t matter what size it is, 6x6 or much larger. It should be remembered that the chimney damper is closed on time. If the coals are not burned enough, carbon monoxide will fill the room. And the consequences of this are very sad. If you close it too late, precious heat will escape into the chimney. Furnace repairs are usually carried out by the person who installed it.

The realization of a long-standing dream - to escape from the stuffy, dusty city - was the construction of a 6 x 8 frame house. The chronicle of construction events may be useful to someone to broaden their horizons, someone will pick up a couple of useful things, and someone may be able to avoid mistakes when independently implementing your project.

Layout project for a 6 x 8 frame house

As usual, before you start doing anything, you need to at least have a general idea of ​​what needs to be done, from what and in what volume. All these questions can be answered. If you decide to do it entirely on your own, then you will have to complete all the steps yourself:

  • Layout;
  • Constructive decisions;
  • choice of heating method;
  • Do not overlook the electrical wiring and plumbing;
  • selection of materials to complete all elements of the house.

A separate point worth mentioning is the approval of the project and obtaining a construction permit. But here, as they say, everyone decides for himself to follow the official path or act at his own peril and risk.

After much thought on the topic of how much space is needed for living, it was decided to settle on the option of a 6 x 8 frame house with an attic. The first floor is full-fledged residential, the second is an attic. Small architectural excesses - a balcony and a “cuckoo” in a simple gable roof.

Using simple graphic editors you can draw layouts:

To visualize the plan, you already need to use specialized software. As a rule, it also contains a library of projects frame houses 6 x 8, where you can get some ideas.

General view of a small 6x8 frame house.

I took as a basis the basis on which frame houses are built in North America and Scandinavia. By design:

  • wall thickness - 15 cm;
  • rafter thickness - 20 cm;
  • ceilings - 15 cm;
  • Mineral wool and penoplex were used as insulation.

Start of construction of a 6x8 frame house. Foundation work

The best time to start construction is spring. Then the whole warm season is ahead - you can get a lot done before the cold weather sets in. But due to a number of circumstances, work began only in September.

Since the load from a turnkey frame two-story house 6 x 8 with an attic is small and the soil is not heaving (sandy loam), then the choice was made on a strip monolithic foundation:

  • laying depth - 50 cm;
  • base height - 50 cm;
  • tape width - 40 cm.

For concrete reinforcement, reinforcement with a diameter of 12 mm was used. Two armored belts of three rods are made. The connection of the rods was made by tying the knitting wire.

The formwork for pouring the tape is made of centimeter plywood and 50 x 50 bars. In total, 18 m3 of concrete was required for pouring.

To ensure the possibility of access of construction equipment to the site of pouring the foundation, the entrance to the site was first filled and installed drainage pipe in the embankment. We also had to hire a tractor to level the construction site and dig a trench for the foundation.

The top layer of soil inside the foundation is removed. Geotextiles were laid and a layer of expanded clay was poured. Approximately it took about 5 m3. The purpose of this operation was to remove rotting organic matter from the underground and insulate the soil.

After complete hardening, the tape is treated with Bitumast waterproofing mastic weighing 21.5 kg. Coating was done manually with a brush.

An important nuance - in reality, the consumption of mastic is twice as much as stated.

According to the instructions, one bucket is enough for 100m/2. Almost everything was spent on waterproofing the basement, although the area there is clearly smaller.

Since the rains were approaching, in order to create more or less bearable conditions for continuing work, we had to buy a used banner and erect some kind of awning over the construction site.

At the same time, larch boards were purchased to make a lining under. The foundation had to be added a little with cement to bring it to “0”. When pouring the foundation, there were slight differences of up to 2 centimeters in height.

Along the upper edge of the tape we lay Technoelast EPP insulation in 2 layers. There is a backing board on top of it. The final stage is to secure it all with anchors to the surface of the foundation.

All. The foundation for the construction of a two-story frame house 6 x 8 is ready. Now you can begin to construct the actual frame of the floor and walls.

Construction of the walls of a 6x8 frame house

The bottom trim and floor joists are made on the backing board. The section of the boards is 150 x 50. The material is the same larch. All connections between parts are made with foamed polyethylene gaskets.

Connections between boards are made using galvanized self-tapping screws 100 x 5 and, if necessary, fastening perforated corners.

The bottom trim is made of two parallel boards installed at a distance of 10 cm. The boards are connected to each other at the corners of the foundation strip and along its entire length every 1 - 1.5 meters. The space between them is tightly filled with insulation. In terms of strength, such a structure is practically not inferior to a solid beam of similar dimensions or several boards jointed in thickness.

In order to be able to work comfortably and safely, the logs were laid OSB boards 18 mm thick. As subsequent events showed, they coped well with the role of the subfloor.

Now it's time to assemble the first wall. The frame is assembled from pine boards 150 x 50. The installation step of the vertical posts is 60 cm. In some places it turned out smaller - then you will have to cut the insulation lengthwise. To ensure spatial rigidity of the structure, it is necessary to install jib bars. Otherwise, the entire structure may end up like a house of cards.

We lay Isoplat between the bottom trim and the wall of the first floor. This insert will improve the soundproofing properties of the frame.

The installation of the wall was completed after dark, but very successfully.

Construction is moving gradually. The awning does its job - protects from rain. Another wall has been installed. There is progress.

At the end of October, all walls and internal partitions of the first floor were installed

A staircase to the future second floor has been completed.

Materials and components for flexible roofing. The construction of the pediment frame begins - the ridge beam is installed.

The role of the roof is still played by the banner. Although it is cold, it is dry. As materials are purchased and delivered, they are stored inside the house and under the overhangs of the awning.

The interfloor ceiling is made of the same 150 x 50 boards connected by lintels. The result is neat cells, where mineral wool will then be installed during insulation.

The frame of the pediments, internal partitions of the second floor and the rafter system are slowly being built.

The cross-section of the rafters is 150 x 50. The installation step is 60 cm. We install jumpers between them every 80 cm. This will subsequently save time and material when insulating the roof. The insulation mats will simply need to be tightly installed into the resulting cells.

Roof structure:

  • wind protection is laid on top of the rafters (Corotop film, density 140 g/m2);
  • block 50 x 50;
  • inch lathing;
  • plywood 12 mm thick;
  • soft roof (bitumen shingles).

We are finishing the roof. Frame house 6 x 8 is gradually taking on recognizable shape.

The windows that were getting in the way underfoot finally waited their time. To finish all the work with the roof, the first thing was to install skylights. Then came the turn of the windows on the first floor:

  • hall - four windows 1500 x 1500, single-chamber, one hinged, two tilt-and-turn;
  • bedroom - one window 1500 x 800, single-chamber, tilt-and-turn;
  • bathroom - two windows 1500 x 600 and 500 x 600;
  • porch - 1500 x 600.

The last to be delivered and installed were the central window and balcony door for the second floor.

The windows were brought in several times. As they arrived, they were installed.

It's already cold outside - winter. Purchased for room heating heat gun Artox 5 kW. In order not to heat the street, empty door and window openings have to be temporarily blocked with improvised materials.

During construction, the doors are made of plywood. After completing the interior and most of the exterior decoration, the

The project of a 6 x 8 frame house with an attic provides for insulation using mineral wool Rockwool LightButts. Looking ahead, I would like to say that in total about 40 m3 of insulation was used. This is not so little, and you need to think in advance about the logistics of supplying, placing and using the material.

Before installing the insulation inside the frame, you need to make sure that it does not fall out. To do this with outside We cover the entire structure with Isoplat. This material simultaneously performs the functions of wind protection, sound insulation and additional thermal insulation.

The size of the mats is 600 x 800 x 50. Thanks to the pre-set pitch of the posts in the frame, the whole process looks quite simple:

  • print out the packaging;
  • we install the insulation between the support beams in a spacer;
  • if the sizes do not match (unfortunately, it turned out that way), we trim construction knife to the required size.

The thickness is increased by installing the mats close to each other. There are three mats on the walls (total thickness 15 cm), four mats on the roof (20 cm).

A separate story. A comprehensive insulation scheme was used (combined use of penoplex and mineral wool).

Floor Pie:

  • penoplex 50 mm;
  • mineral wool - 100 mm;
  • Corotop vapor barrier;
  • OSB - 18mm.

More on initial stage One-inch boards were nailed to the underside of the joists, acting as skull blocks. The penoplex will rest on the formed protrusions.

Since the material is not afraid of moisture, no insulation is required on the underground side. Penoplex slabs are cut to size with a hacksaw and installed between the joists.

Along the perimeter of the sheets and joints, where we had to fill up the area from scraps of material, we carry out sealing polyurethane foam. Cut off the frozen excess with a knife. This results in a continuous heat-insulating layer.

Place a layer of mineral wool on top. The principles are the same - tight installation and offset placement so that the seams do not intersect.

We cover the surface of the insulation with a vapor barrier. This will help protect it in the future from moisture from the room. At the very end, we spread Vibrostack strips over the joists and install the OSB back and secure it with self-tapping screws.

Floor attic floor insulated a little differently:

  • we line the ceiling of the attic floor with Tyvek vapor barrier;
  • the Isoplat plate is fixed;
  • from the attic side, 15 cm of Rockwool is laid inside the ceiling;
  • Cover the entire layer on top with thermal insulation again;
  • We lay 4mm thick Vibrostack strips along the joists.

We lay a subfloor made of 18 mm OSB (the ceiling above the bathroom and bathhouse in a two-story 6 x 8 frame house is made of two layers of waterproof plywood 12 mm thick).

Heating and ventilation of a frame house

Frame projects country houses 6 x 8 necessarily provide a heating source. And this construction is no exception.

The main source of heat is wood burning stove. There are no plans for gas yet, you can cook with electricity, and a burning fireplace is simply beautiful.

Under the stove, even at the stage of foundation work, a small area was poured that was not connected to the main foundation. The dimensions of the base are 1.2 x 1.4 m. The height of the base is comparable to the tape. Half a meter is buried in the ground and the same amount outside.

Beginning - the base of the furnace

The master’s work is progressing well, and quickly enough it’s time to install the combustion chamber and screen. The door for the Pisla 510 fireplace was obtained relatively cheaply for 15 thousand. Managed to find it on sale.

The masonry of the fireplace is gradually progressing. It is a pleasure to watch specialists at work.

The future furnace has almost reached the ceiling. There are no severe frosts yet, which is very pleasing. And it inspires some optimism.

It just so happened that the last windows and the first fire coincided. We carry out the first heating. Since the stove still needs to settle, we heat it without fanaticism - carefully so as not to spoil all the work.

Over the course of three hours of heating, the temperature in the room rose by 10 - 15 °C. Considering that the thermal insulation of the house is not yet completely finished, there is no vestibule and instead front door there is plywood on hinges covered with a blanket, the result is quite decent.

Now is the time to talk about what is essentially a sealed thermos. If there is no ventilation, then best case scenario the air will be musty and stale. In the worst case, the insulation and wooden elements will begin to become damp.

For the ventilation system, I purchased a Domen Regio recuperator with a capacity of 250 m3/hour and a set of air ducts. The installation allows, in my opinion, to perform the most important function - to regulate productivity and, if necessary, to heat the supplied air. Heating is carried out using a built-in 1KW heating element. The maximum temperature of the supplied air can reach + 30°C.

In practice it looks like this:

  • if we are leaving for a long time, we set the installation power to 5 - 10%;
  • We return - we transfer it to full operating mode.

Installation of the recuperator on vibration suspensions, routing of air ducts and commissioning ventilation system was carried out by specialists from the company where the equipment was ordered. It should be noted that the system is working, there is a slight heating up and the impressions so far are very positive.

Installation of ventilation air ducts in a frame house.

It’s also worth talking about electricity. Entry into the house is carried out with a 5 x 6 cable. Accordingly, the following were purchased and installed:

  • two-pole input circuit breaker;
  • ABB distribution board;
  • distribution boxes and strips;
  • automatic machines 16-40A (10 pcs).

Wiring inside the house is carried out in a metal hose inside the walls. Passage through power elements The frame is made through pre-drilled holes.

The interior decoration was made from my favorite material - wood. Although sometimes a worm of doubt crept in and wanted drywall and wallpaper. They say it’s simpler and more elegant. But the tree still won unconditionally.

I started the paneling from the second floor. We used larch lining 110 mm, in half extra grade and grade A. Than better quality material, the easier, simpler and faster it is to work with it.

In addition, higher-quality lining has no waste due to the absence of knot cracks, resin pockets and deformations for which varieties AB and B are so rich.

Interior decoration of the attic walls of a frame house.

It was decided to make the living room a little more elaborate, so that there would be no associations with a beautiful barn:

The bottom of the walls, up to a level of approximately 80 - 100 cm, is still sheathed with larch clapboard. Above, from this level to the very top, I attached the abasha paneling. All the artistic sophistication lies in the orientation (vertical) and the alternation of wide and narrow boards. Of course, I had to tinker a little, but overall it looks very good.

In other rooms, the walls are also sheathed with alternating boards, but in the usual horizontal orientation.

To prevent the insulation from getting wet, it is covered with a Tyvek vapor barrier on the room side. The joints were taped with metallized tape.

Slowly, as finishing is completed, you can begin to settle in. Sofa in the attic.

Wardrobe in a niche on the second floor. The closet turned out to be very roomy. Somewhere around three cubes. There is room to turn around, or rather to fit in.

The work does not proceed sequentially one after another, but as the weather permits, the availability of materials, and the presence of other urgent matters. Exterior finishing frame country house 6 x 8 was produced exactly according to this principle.

On top of the installed Izoplata, I installed wind insulation produced by TechnoNIKOL on the walls. Classic technology:

  • rolls overlap by 15 - 20 cm;
  • fastening with a stapler.

Everything else was sewn up in the spring, when it’s warm and pleasant to work outside.

The material used to carry out the work is still the same - grade A larch lining. Advantages - resistant to water, convenient to work (high-quality good material). Disadvantages - expensive, fragile (it is necessary to drill holes for fasteners).

The roof overhangs and wind boards on the gables were covered with plastic. Durable (does not rot), aesthetically pleasing and easy to install. No matter which way you look at it, there are continuous advantages everywhere.

Landscaping

The house is almost ready. You can already live. Although there are still many deficiencies left. The time has come to improve the area and provide yourself with a comfortable life.

So, we started with the fence. Posts for gates. Base casting, profile pipe, lining facing bricks. It seems that everything is clear, there is nothing extremely complex or cunning.

Using the same principle, we make the entire 40-meter fence. We attach painted corrugated sheeting to the posts. As they say, cheap and cheerful.

The most an important part fencing, automatic sliding gates. Very convenient, although not so cheap anymore.

Well, as for amenities, a sewer system was installed. A septic tank was dug and a sewer system was installed. Now in a two-story frame house 6 x 8, a bathhouse, toilet, shower and other signs of civilization take place and can function fully.

My mistakes and conclusions after building a 6x8 frame house

The experience gained shows that 6 x 8 turnkey on your own is quite possible. Hired workers were involved in the foundation, stove, and ventilation. Digging a well does not count, since this is more of an improvement and has an indirect relation to construction.

Looking back, I would like to draw several important conclusions:


To summarize, we can say that it is quite possible to make your dream come true. And the independent realization of a dream reduces the price of a 6 x 8 frame house by one and a half to two times, which means it makes the dream even more attractive and achievable.

"Russkaya Postroechka" builds frame houses with a turnkey boiler room. The company has been a leader in the Central and Northwestern regions of Russia for five years. Our catalog contains 15 finished projects frame houses with a boiler room. You can buy any of them. Installation is included in the price. If you want to get an original frame house with a boiler room, you can order an individual design. The price of this option is slightly higher, but you can get a house exclusively “for yourself”, taking into account all your preferences and requests. An alternative to individual project production is to buy standard version, but make some changes to it.

We deliver the materials necessary for construction to the site and promptly begin work, involving a team of experienced builders. Payment is made in a form convenient for the customer: the first part (70%) immediately after delivery of materials, the second part (30%) after completion of construction. Since we use materials from our own woodworking production, our prices for frame houses with a boiler room are very affordable.

Why is it worth buying a frame house with a boiler room?

Building a frame house right away with a boiler room has its advantages.

  1. You are building one building, not two. Accordingly, you save on the foundation, frame, insulation, and roofing. The price of a house with a boiler room will be noticeably lower than the cost of two separate buildings.
  2. You save space. There is no need to occupy part of the yard for a boiler room, thus, there is more usable space.
  3. You get more convenience and practicality. The heating and hot water supply system in the house should always be under control, and it is easier to maintain it when the boiler room is “at hand”, rather than in a separate building across the yard.

Of course, boiler room equipment under one roof with residential building requires compliance with strict fire safety standards. Our projects allow you to ensure the safe location of heating equipment.

Contact us to get qualified advice and order a frame house with a boiler room from professionals! Our phone number is free.