The realization of a long-standing dream - to escape from the stuffy, dusty city - was the construction frame house 6 x 8. The chronicle of construction events may be useful to someone to broaden their horizons, someone will pick up a couple of useful things, and someone may be able to avoid mistakes when implementing their project independently.

Layout project for a 6 x 8 frame house

As usual, before you start doing anything, you need to at least have a general idea of ​​what needs to be done, from what and in what volume. All these questions can be answered. If you decide to do it entirely on your own, then you will have to complete all the steps yourself:

  • Layout;
  • Constructive decisions;
  • choice of heating method;
  • Do not overlook the electrical wiring and plumbing;
  • selection of materials to complete all elements of the house.

A separate point worth mentioning is the approval of the project and obtaining a construction permit. But here, as they say, everyone decides for himself to follow the official path or act at his own peril and risk.

After much thought on the topic of how much space is needed for living, it was decided to settle on the option of a 6 x 8 frame house with an attic. The first floor is full-fledged residential, the second is an attic. Small architectural excesses - a balcony and a “cuckoo” in a simple gable roof.

Using simple graphic editors you can draw layouts:

To visualize the plan, you already need to use specialized software. As a rule, it also contains a library of projects frame houses 6 x 8, where you can get some ideas.

General view of a small 6x8 frame house.

I took as a basis the basis on which frame houses are built in North America and Scandinavia. By design:

  • wall thickness - 15 cm;
  • rafter thickness - 20 cm;
  • ceilings - 15 cm;
  • Mineral wool and penoplex were used as insulation.

Start of construction of a 6x8 frame house. Foundation work

The best time to start construction is spring. Then the whole warm season is ahead - you can get a lot done before the cold weather sets in. But due to a number of circumstances, work began only in September.

Since the load from a turnkey frame two-story house 6 x 8 with an attic is small and the soil is not heaving (sandy loam), then the choice was made on a strip monolithic foundation:

  • laying depth - 50 cm;
  • base height - 50 cm;
  • tape width - 40 cm.

For concrete reinforcement, reinforcement with a diameter of 12 mm was used. Two armored belts of three rods are made. The connection of the rods was made by tying the knitting wire.

The formwork for pouring the tape is made of centimeter plywood and 50 x 50 bars. In total, 18 m3 of concrete was required for pouring.

To ensure the possibility of access of construction equipment to the site of pouring the foundation, the entrance to the site was first filled and installed drainage pipe in the embankment. We also had to hire a tractor to level the construction site and dig a trench for the foundation.

The top layer of soil inside the foundation is removed. Geotextiles were laid and a layer of expanded clay was poured. Approximately it took about 5 m3. The purpose of this operation was to remove rotting organic matter from the underground and insulate the soil.

After complete hardening, the tape is treated with Bitumast waterproofing mastic weighing 21.5 kg. Coating was done manually with a brush.

An important nuance - in reality, the consumption of mastic is twice as much as stated.

According to the instructions, one bucket is enough for 100m/2. Almost everything was spent on waterproofing the basement, although the area there is clearly smaller.

Since the rains were approaching, in order to create more or less bearable conditions for continuing work, we had to buy a used banner and erect some kind of awning over the construction site.

At the same time, larch boards were purchased to make a lining under. The foundation had to be added a little with cement to bring it to “0”. When pouring the foundation, there were slight differences of up to 2 centimeters in height.

Along the upper edge of the tape we lay Technoelast EPP insulation in 2 layers. There is a backing board on top of it. The final stage is to secure it all with anchors to the surface of the foundation.

All. The foundation for the construction of a two-story frame house 6 x 8 is ready. Now you can begin to construct the actual frame of the floor and walls.

Construction of the walls of a 6x8 frame house

The bottom trim and floor joists are made on the backing board. The section of the boards is 150 x 50. The material is the same larch. All connections between parts are made with foamed polyethylene gaskets.

Connections between boards are made using galvanized self-tapping screws 100 x 5 and, if necessary, fastening perforated corners.

The bottom trim is made of two parallel boards installed at a distance of 10 cm. The boards are connected to each other at the corners of the foundation strip and along its entire length every 1 - 1.5 meters. The space between them is tightly filled with insulation. In terms of strength, such a structure is practically not inferior to a solid beam of similar dimensions or several boards jointed in thickness.

In order to be able to work comfortably and safely, the logs were laid OSB boards 18 mm thick. As subsequent events showed, they coped well with the role of the subfloor.

Now it's time to assemble the first wall. The frame is assembled from pine boards 150 x 50. The installation step of the vertical posts is 60 cm. In some places it turned out smaller - then you will have to cut the insulation lengthwise. To ensure spatial rigidity of the structure, it is necessary to install jib bars. Otherwise, the entire structure may end up like a house of cards.

We lay Isoplat between the bottom trim and the wall of the first floor. This insert will improve the soundproofing properties of the frame.

The installation of the wall was completed after dark, but very successfully.

Construction is moving gradually. The awning does its job - protects from rain. Another wall has been installed. There is progress.

At the end of October, all walls and internal partitions of the first floor were installed

A staircase to the future second floor has been completed.

Materials and components for flexible roofing. The construction of the pediment frame begins - the ridge beam is installed.

The role of the roof is still played by the banner. Although it is cold, it is dry. As materials are purchased and delivered, they are stored inside the house and under the overhangs of the awning.

The interfloor ceiling is made of the same 150 x 50 boards connected by lintels. The result is neat cells, where mineral wool will then be installed during insulation.

The frame of the gables is slowly being built, internal partitions second floor and rafter system.

The cross-section of the rafters is 150 x 50. The installation step is 60 cm. We install jumpers between them every 80 cm. This will subsequently save time and material when insulating the roof. The insulation mats will simply need to be tightly installed into the resulting cells.

Roof structure:

  • wind protection is laid on top of the rafters (Corotop film, density 140 g/m2);
  • block 50 x 50;
  • inch lathing;
  • plywood 12 mm thick;
  • soft roof (bitumen shingles).

We are finishing the roof. Frame house 6 x 8 is gradually taking on recognizable shape.

The windows that were getting in the way underfoot finally waited their time. To finish all the work with the roof, the first thing was to install skylights. Then came the turn of the windows on the first floor:

  • hall - four windows 1500 x 1500, single-chamber, one hinged, two tilt-and-turn;
  • bedroom - one window 1500 x 800, single-chamber, tilt-and-turn;
  • bathroom - two windows 1500 x 600 and 500 x 600;
  • porch - 1500 x 600.

The last to be delivered and installed were the central window and balcony door for the second floor.

The windows were brought in several times. As they arrived, they were installed.

It's already cold outside - winter. Purchased for room heating heat gun Artox 5 kW. In order not to heat the street, empty door and window openings have to be temporarily blocked with improvised materials.

During construction, the doors are made of plywood. After completing the interior and most of the exterior decoration, the

The project of a 6 x 8 frame house with an attic provides for insulation using mineral wool Rockwool LightButts. Looking ahead, I would like to say that in total about 40 m3 of insulation was used. This is not so little, and you need to think in advance about the logistics of supplying, placing and using the material.

Before installing the insulation inside the frame, you need to make sure that it does not fall out. To do this with outside We cover the entire structure with Isoplat. This material simultaneously performs the functions of wind protection, sound insulation and additional thermal insulation.

The size of the mats is 600 x 800 x 50. Thanks to the pre-set pitch of the posts in the frame, the whole process looks quite simple:

  • print out the packaging;
  • we install the insulation between the support beams in a spacer;
  • if the sizes do not match (unfortunately, it turned out that way), we trim construction knife to the required size.

The thickness is increased by installing the mats close to each other. There are three mats on the walls (total thickness 15 cm), four mats on the roof (20 cm).

A separate story. A comprehensive insulation scheme was used (combined use of penoplex and mineral wool).

Floor Pie:

  • penoplex 50 mm;
  • mineral wool - 100 mm;
  • Corotop vapor barrier;
  • OSB - 18mm.

More on initial stage One-inch boards were nailed to the underside of the joists, acting as skull blocks. The penoplex will rest on the formed protrusions.

Since the material is not afraid of moisture, no insulation is required on the underground side. Penoplex slabs are cut to size with a hacksaw and installed between the joists.

Along the perimeter of the sheets and joints, where we had to fill up the area from scraps of material, we carry out sealing polyurethane foam. Cut off the frozen excess with a knife. This results in a continuous heat-insulating layer.

Place a layer of mineral wool on top. The principles are the same - tight installation and offset placement so that the seams do not intersect.

We cover the surface of the insulation with a vapor barrier. This will help protect it in the future from moisture from the room. At the very end, we spread Vibrostack strips over the joists and install the OSB back and secure it with self-tapping screws.

Floor attic floor insulated a little differently:

  • we line the ceiling of the attic floor with Tyvek vapor barrier;
  • the Isoplat plate is fixed;
  • from the attic side, 15 cm of Rockwool is laid inside the ceiling;
  • Cover the entire layer on top with thermal insulation again;
  • We lay 4mm thick Vibrostack strips along the joists.

We lay a subfloor made of 18 mm OSB (the ceiling above the bathroom and bathhouse in a two-story 6 x 8 frame house is made of two layers of waterproof plywood 12 mm thick).

Heating and ventilation of a frame house

Frame projects country houses 6 x 8 necessarily provide a heating source. And this construction is no exception.

The main source of heat is wood burning stove. There are no plans for gas yet, you can cook with electricity, and a burning fireplace is simply beautiful.

Under the stove, even at the stage of foundation work, a small area was poured that was not connected to the main foundation. The dimensions of the base are 1.2 x 1.4 m. The height of the base is comparable to the tape. Half a meter is buried in the ground and the same amount outside.

Beginning - the base of the furnace

The master’s work is progressing well, and quickly enough it’s time to install the combustion chamber and screen. The door for the Pisla 510 fireplace was obtained relatively cheaply for 15 thousand. Managed to find it on sale.

The masonry of the fireplace is gradually progressing. It is a pleasure to watch specialists at work.

The future furnace has almost reached the ceiling. There are no severe frosts yet, which is very pleasing. And it inspires some optimism.

It just so happened that the last windows and the first fire coincided. We carry out the first heating. Since the stove still needs to settle, we heat it without fanaticism - carefully so as not to spoil all the work.

Over the course of three hours of heating, the temperature in the room rose by 10 - 15 °C. Considering that the thermal insulation of the house is not yet completely finished, there is no vestibule and instead front door there is plywood on hinges covered with a blanket, the result is quite decent.

Now is the time to talk about what is essentially a sealed thermos. If there is no ventilation, then best case scenario the air will be musty and stale. In the worst case, the insulation and wooden elements will begin to become damp.

For the ventilation system, I purchased a Domen Regio recuperator with a capacity of 250 m3/hour and a set of air ducts. The installation allows, in my opinion, to perform the most important function - to regulate productivity and, if necessary, to heat the supplied air. Heating is carried out using a built-in 1KW heating element. The maximum temperature of the supplied air can reach + 30°C.

In practice it looks like this:

  • if we are leaving for a long time, we set the installation power to 5 - 10%;
  • We return - we transfer it to full operating mode.

Installation of the recuperator on vibration suspensions, routing of air ducts and commissioning ventilation system was carried out by specialists from the company where the equipment was ordered. It should be noted that the system is working, there is a slight heating up and the impressions so far are very positive.

Installation of ventilation air ducts in a frame house.

It’s also worth talking about electricity. Entry into the house is carried out with a 5 x 6 cable. Accordingly, the following were purchased and installed:

  • two-pole input circuit breaker;
  • ABB distribution board;
  • distribution boxes and strips;
  • automatic machines 16-40A (10 pcs).

Wiring inside the house is carried out in a metal hose inside the walls. Passage through power elements The frame is made through pre-drilled holes.

The interior decoration was made from my favorite material - wood. Although sometimes a worm of doubt crept in and wanted drywall and wallpaper. They say it’s simpler and more elegant. But the tree still won unconditionally.

I started the paneling from the second floor. We used larch lining 110 mm, in half extra grade and grade A. Than better quality material, the easier, simpler and faster it is to work with it.

In addition, higher-quality lining has no waste due to the absence of knot cracks, resin pockets and deformations for which varieties AB and B are so rich.

Interior decoration of the attic walls of a frame house.

It was decided to make the living room a little more elaborate, so that there would be no associations with a beautiful barn:

The bottom of the walls, up to a level of approximately 80 - 100 cm, is still sheathed with larch clapboard. Above, from this level to the very top, I attached the abasha paneling. All the artistic sophistication lies in the orientation (vertical) and the alternation of wide and narrow boards. Of course, I had to tinker a little, but overall it looks very good.

In other rooms, the walls are also sheathed with alternating boards, but in the usual horizontal orientation.

To prevent the insulation from getting wet, it is covered with a Tyvek vapor barrier on the room side. The joints were taped with metallized tape.

Slowly, as finishing is completed, you can begin to settle in. Sofa in the attic.

Wardrobe in a niche on the second floor. The closet turned out to be very roomy. Somewhere around three cubes. There is room to turn around, or rather to fit in.

The work does not proceed sequentially one after another, but as the weather permits, the availability of materials, and the presence of other urgent matters. Exterior finishing of frame country house 6 x 8 was produced exactly according to this principle.

On top of the installed Izoplata, I installed wind insulation produced by TechnoNIKOL on the walls. Classic technology:

  • rolls overlap by 15 - 20 cm;
  • fastening with a stapler.

Everything else was sewn up in the spring, when it’s warm and pleasant to work outside.

The material used to carry out the work is still the same - grade A larch lining. Advantages - resistant to water, convenient to work (high-quality good material). Disadvantages - expensive, fragile (it is necessary to drill holes for fasteners).

The roof overhangs and wind boards on the gables were covered with plastic. Durable (does not rot), aesthetically pleasing and easy to install. No matter which way you look at it, there are continuous advantages everywhere.

Landscaping

The house is almost ready. You can already live. Although there are still many deficiencies left. The time has come to improve the area and provide yourself with a comfortable life.

So, we started with the fence. Posts for gates. Base casting, profile pipe, lining facing bricks. It seems that everything is clear, there is nothing extremely complex or cunning.

Using the same principle, we make the entire 40-meter fence. We attach painted corrugated sheeting to the posts. As they say, cheap and cheerful.

The most an important part fencing, automatic sliding gates. Very convenient, although not so cheap anymore.

Well, as for amenities, a sewer system was installed. A septic tank was dug and a sewer system was installed. Now in a two-story frame house 6 x 8, a bathhouse, toilet, shower and other signs of civilization take place and can function fully.

My mistakes and conclusions after building a 6x8 frame house

The experience gained shows that 6 x 8 turnkey on your own is quite possible. Hired workers were involved in the foundation, stove, and ventilation. Digging a well does not count, since this is more of an improvement and has an indirect relation to construction.

Looking back, I would like to draw several important conclusions:


To summarize, we can say that it is quite possible to make your dream come true. And the independent realization of a dream reduces the price of a 6 x 8 frame house by one and a half to two times, which means it makes the dream even more attractive and achievable.

Houses made of timber with a boiler room are created for winter use. The presence of a special combustion room indicates that this good project, specially prepared for year-round use.

The boiler room can be located in a one-story cottage, or on ground floor. It depends on the wishes of the customer, the chosen project and the preferred heating system.

Where should the boiler room be located?

In most country cottage layouts, the furnace room is located on the ground floor. This is due to the fact that the lion’s share of thermal heating schemes involves a reinforced circuit on the ground floor. The second floor is heated less intensively, and often has no heating at all.

A properly designed boiler room must meet all technical requirements and be responsible not only for heating, but also for heating water.

Often the bathroom and toilet are located near the furnace room to ensure strong water pressure.

What should be placed in the boiler room?

When ordering turnkey construction, you need to understand what units and devices should be in the furnace room. The optimal list looks like this:

  • Boilers.

They can operate on coal, gas, wood briquettes and biofuel. For heating a cottage made of profiled timber, both mono-boilers (working on one type of fuel) and combined solutions are suitable. They are capable of processing several different energy sources.

  • Devices for heating running water.

These are usually electric boilers. Less often geysers different power.

  • Water container.

A large tank in which heated water accumulates. Usually its capacity does not exceed 150-200 liters. This is enough for 2-3 people during the day. The water in such a container can remain hot for a long time.

In addition, filters for rough water purification, hydraulic separators, various elements pipe piping, shut-off valves and electrical panel.

150x150 150x200 200x200 145x145 145x195 195x195

BASIC EQUIPMENT OF A SHRINKABLE HOUSE FROM NATURAL HUMIDITY MATERIAL (INCLUDING ASSEMBLY AND DELIVERY):

  • Log house - timber 150x150 mm (1st and 2nd floor).
  • All partitions are 100x150 mm timber (1st and 2nd floor).
  • Raising the walls of the second floor is 1.2 m.
  • Floor and ceiling beams - timber 100x150 mm. (after 59 cm to the size of the insulation).
  • The roof gables are timber 150x150 mm (height 2.6 m).
  • The rafter system is a board 50x150 mm (59 cm below the size of the insulation).
  • Roof outlets of at least 50 cm.
  • Roof sheathing – board 25x150 mm.
  • Roof covering with roofing felt.
  • Treatment lower crown and genital lags with an antiseptic.
  • The clear height of the 1st floor is 2.7 m (+/- 5 cm clear from beam to beam).
  • The clear height of the 2nd floor is 2.5 m (+/- 5 cm clear from the beam to the ceiling crossbar).
  • All Consumables(wooden dowels, flax fiber (jute), nails, staples, roofing felt).
  • Free delivery within the Moscow region and up to 600 km from our production base.
  • Assembling the walls of the log house on wooden dowels (dowels);
  • Chopping corner connections in a dovetail (warm corner)
  • Installation of windows, doors, flooring, stairs and roof insulation is carried out after 6-7 months (after complete shrinkage of the log house) and is not included in the package.
  • Cleaning waste inside and outside the building into separate piles.
Service Description Price
Strapping beam for pile foundation Serves as a tie for piles and support for floor beams 150x200 18000 rub.
Subfloor on 1st floor Edged board 25x100-150mm 17000 rub.
Subfloor on 2nd floor Edged board 25x100-150mm 17000 rub.
Additional crown Increasing the height of log ceilings On request
Replacement of internal partitions Increase in thickness from 100 to 150 mm On request
Replacement of genital and ceiling beams from 100x150 mm at 100x200 mm 1st floor On request
at 100x200 mm 2nd floor On request
Generator rental Provided if there is no electricity on site, only gasoline is paid for for free
Construction shed size 2x4 In the absence of housing for builders (after construction it remains with the customer) 18,000 rub.
Profiled timber "for a block house" Rounding outside profiled timber of any section. For free
Mirroring a Project For free
changing the project without increasing the material For free

Select the construction location on the map and the delivery cost will be calculated automatically

View dimensions

View dimensions

STAGES OF COOPERATION

First contact.
We discuss basic issues by phone or email.

We coordinate construction details on site. It is important for us to know the location of the house on the site and the access route to it.

Signing the contract.
We draw up a transparent contract. Prepayment 1% - 5%.

Delivery of the house kit to the site, arrival of the team. After unloading, 74% of the cost is paid.

Construction of a house.
The construction period for a house "for shrinkage" is 14 - 30 days, depending on the object.

Acceptance and guarantees.
Signing the acceptance certificate and paying the remaining 25%. 3 year warranty.

Project description:

A 6x8 house project with a turnkey boiler room offers inexpensive purchase construction company“Kostroma Plotnik”. Comfortable house with a total area of ​​98.2 sq. m will be for you ideal option both for recreation and for living. A special feature of the project is the presence of its own boiler room, thanks to which you will be able to maintain optimal temperature in all rooms.

A terrace was designed for the entrance to the house made of 6 by 8 timber, after which there is a hall (12.1 m2). To the right of the hall there is a bathroom and a boiler room, and to the left is a living room (17.0 m2), the area of ​​which is increased due to the attached bay window. Next to the living room there is a kitchen-dining room (10.4 m2). On the upper level there are two rooms with an area of ​​21.7 m2 each.

DO YOU HAVE YOUR OWN PRODUCTION?

Yes, we have own production. We are engaged in the procurement and production of lumber of any section. We also directly engage in felling of log houses. different types(“bowl”, “in the paw”, sharpening a log for a plane, as well as for a scraper).

HOW LONG HAVE YOU BEEN ON THE MARKET?

“KostromaPlotnik” has been working in its field for 5 years and already has a good reputation for the quality of service, work and material supply.

WHY YOUR COMPANY?

I want to answer you as the head of the company. We bear great responsibility for the material we supply and its installation. We give a guarantee on houses. We employ only Russians, professionals in their field (which is not at all important). We love to build houses, we love to work and communicate with people. We have optimal prices for the construction of houses. Often people only look at the cost of the job and not the quality. I can give an example of such a situation. Some time ago there was a call from the Customer. He was very upset. He started the first construction - a bathhouse. The customer was looking for cheap option and found it. The bathhouse arrived incompletely equipped. Even workers were not provided for the construction. Although everything was spelled out in the contract. The quality of the cutting itself was disgusting. Having called the company, they simply answered: “What you ordered is what you received.” After this, the Customer contacted us. He was given a brigade. Arriving at the place, the guys were shocked by what they saw. As they say: “I wish I could tear off these masters’ hands.” This is what the low price and attitude to work indicate. Advice for the future, always think about your decision! As for the Customer, my workers assembled a good bathhouse. A year later, he ordered a good, solid house from us.

"Russkaya Postroechka" builds frame houses with a turnkey boiler room. The company has been a leader in the Central and Northwestern regions of Russia for five years. Our catalog contains 15 ready-made projects of frame houses with a boiler room. You can buy any of them. Installation is included in the price. If you want to get an original frame house with a boiler room, you can order an individual design. The price of this option is slightly higher, but you can get a house exclusively “for yourself”, taking into account all your preferences and requests. An alternative to individual project production is to buy standard version, but make some changes to it.

We deliver the materials necessary for construction to the site and promptly begin work, involving a team of experienced builders. Payment is made in a form convenient for the customer: the first part (70%) immediately after delivery of materials, the second part (30%) after completion of construction. Since we use materials from our own woodworking production, our prices for frame houses with a boiler room are very affordable.

Why is it worth buying a frame house with a boiler room?

Building a frame house right away with a boiler room has its advantages.

  1. You are building one building, not two. Accordingly, you save on the foundation, frame, insulation, and roofing. The price of a house with a boiler room will be noticeably lower than the cost of two separate buildings.
  2. You save space. There is no need to occupy part of the yard for a boiler room, thus, there is more usable space.
  3. You get more convenience and practicality. The heating and hot water supply system in the house should always be under control, and it is easier to maintain it when the boiler room is “at hand”, rather than in a separate building across the yard.

Of course, boiler room equipment under one roof with residential building requires strict compliance fire safety. Our projects allow you to ensure the safe location of heating equipment.

Contact us to get qualified advice and order a frame house with a boiler room from professionals! Our phone number is free.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered finishing elements made of wood, made locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are made according to individual order and laminated in colors according to the project. Additional accents are placed thanks to professional painting of imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family it was exactly this not an easy task. They had a foundation from an old house that had burned down, and landscaped area Around him! A new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow quickly and in own home There are many opportunities in nature and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get acquainted with the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to carry out a difficult and expressive country project with spacious premises and garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also important for Dmitry exact dates construction, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated basalt insulation in 200mm; interfloor covering with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of the house with exterior finishing and then work on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation was erected - USHP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to the powerful roof overhangs, interfloor belt and big windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received a gift of reinforced concrete floors, one of the leading construction teams and a house according to the design he liked, which stood on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to someone else to a good person! Andrey Rumyantsev came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house... It was decided to build the house from aerated concrete blocks so that the future handsome country man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies We have stepped forward so much that such unique configurations become available in a short time, because we built this project over the winter months. The main thing is to own the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute of the future house was a dizzying terrace (51.1 m2) and large balcony oriented to beauty! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! Made the house even more spectacular vertical finishing imitation of timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with individual project, found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We have done preliminary calculations on the project, took a tour of the active construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!