Derricker training. Profession Higher erector (4th category) in the Unified Tariff Qualification Directory Cost of training and terms of development

Unified Tariff and Qualification Directory of Works and Professions of Workers (UTKS), 2019
Issue No. 6 ETKS
The release was approved by the Decree of the Ministry of Labor and social development Russian Federation dated November 14, 2000 N 81

Vyshkomontazhnik

§ 2. Derrick erector of the 3rd category

Characteristics of work. Installation, dismantling and transportation of drilling rig blocks, boiler units, water pumping units, fuel oil units, electric drilling equipment, metal transition platforms, ladders, ladders and fences on power, pumping, energy, derrick and winch units and drilling fluid cleaning systems. Device concrete covering under the drilling rig, bases and platforms for spare tanks and clay mixers, fences for moving parts of mechanisms. Performing excavation, concrete, plumbing, carpentry and loading and unloading work during the assembly and disassembly of towers and superstructures. Installation of anchors for securing and centering the tower. Layout of locations for foundations of drilling equipment and off-site structures under the guidance of a more highly qualified derrick operator. Laying and piping of steam and water lines. Drilling lubrication and technological equipment. Preparing auxiliary equipment for transportation. Assembly, movement and disassembly of drilling rigs for geological exploration drilling with towers of all types and designs.

Must know: purpose of drilling rigs, used mechanisms and equipment; purpose of tower parts and structural units of foundations, foundations and superstructures; dimensions of constructed fences for barns and work sites; methods of installation, dismantling and transportation of drilling rigs; layout of drilling equipment and communications; technical characteristics of mechanisms used in tower construction; placement of instrumentation; rules for using metalwork and carpentry tools; rules for slinging, lifting and moving small cargo; conditional alarm for crane operators.

§ 3. Derrick erector of the 4th category

Characteristics of work. Installation, dismantling and transportation of drilling rigs, overhead structures, mechanisms for raising and lowering derricks, equipment circulation system cleaning of drilling fluid, block of spare tanks, power unit and means of mechanization and automation. Breakdown of the locations of foundations for drilling equipment and subsurface foundations. Laying and piping of exhaust manifolds for diesel engines, participation in the assembly and crimping of injection lines and manifolds under the guidance of a more highly qualified rigger. Alignment of the drilling rig, drilling, power equipment and individual blocks of the drilling rig. Leading a derrick crew in assembling, moving and disassembling drilling rigs for geological exploration drilling with towers of all types and designs used in geological exploration equipment.

Must know: methods and rules for installation, dismantling and transportation of drilling rigs; design of a mechanization and automation complex; purpose and technical characteristics a set of mechanisms for lowering and lifting operations, circulation system mechanisms, steam and water supply communications, electrical supply, pneumatic systems and heating of workplaces and mechanisms; rules for the production of slings, rigging work using lifting mechanisms.

§ 4. Derrick erector of the 5th category

Characteristics of work. Installation and dismantling of: main process equipment, drilling process control panels, rotary cranes, metal frames for covering drilling rig blocks, automatic lowering and lifting of drilling tools, automation equipment; tire-pneumatic couplings; A-shaped derricks and tower-type derricks up to 45 m high. Lifting and installation of individual blocks of the drilling rig, drilling and power equipment on the foundation. Docking of blocks using lifting Vehicle. Assembly and crimping of injection lines and manifolds with pressure up to 15 MPa (150 kgf/sq. cm). Power transmission alignment. Reactivation and testing of drilling equipment and drilling rigs. Management of the rig crew during installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of up to 100 tons.

Must know: industrial methods for constructing drilling rigs of all types; design of drilling rigs, drilling equipment, mechanisms used during their installation and dismantling; high and high pipeline communication diagrams low pressure, fuel system, instrumentation and equipment; methods of installation and dismantling of tire-pneumatic couplings; methods of alignment and testing of the equipment used and the drilling rig; basic rules for the production of electric welding, electrical installation, slinging and rigging works; purpose of hydrocyclone and degassing installations; types of vehicles for transporting large blocks.

§ 5. Derrick erector of the 6th category

Characteristics of work. Acceptance of the drilling rig for installation and commissioning after installation. Installation and dismantling of A-frame towers and tower type towers. Assembly and pressure testing of injection lines and manifolds with pressures from over 15 MPa to 30 MPa (over 150 kgf/sq. cm to 300 kgf/sq. cm). Binding standard scheme arrangement of drilling rig equipment to terrain conditions. Selecting a route for transporting drilling rig blocks. Placement according to the diagram of drilling equipment, transport and lifting equipment and materials. Travel system equipment. Test launch of the drilling rig. Preparation of relevant documentation for the drilling rig. Management of the rig crew during the installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of over 100 tons up to and including 200 tons.

Must know: the procedure for accepting the drilling rig for installation and putting it into operation after installation; layout diagrams of drilling rig equipment, rational arrangement of construction and installation equipment on construction site; the influence of soil conditions and terrain on the choice of route and methods of moving the drilling rig; hydraulic system drilling rigs; standard projects organization of workplaces and network planning during the construction of drilling rigs; purpose, design and operating rules of vehicles for transporting large blocks.

§ 6. Derrick erector of the 7th category

Characteristics of work. Acceptance of the drilling rig for installation and commissioning after installation. Installation and dismantling of A-shaped towers, tower-type towers and complex structures with a height of over 45 m. Assembly and pressure testing of injection lines and manifolds with a pressure of over 30 MPa (over 300 kgf/sq. cm). Linking the standard layout of drilling rig equipment to terrain conditions. Selecting a route for transporting drilling rig blocks. Placement according to the diagram of drilling equipment, transport and lifting equipment and materials. Travel system equipment. Test launch of the drilling rig. Preparation of relevant documentation for the drilling rig. Management of the rig crew during the installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of over 200 tons up to and including 250 tons.

Must know: the procedure for accepting the drilling rig for installation and putting it into operation after installation; layout diagrams of drilling rig equipment, rational arrangement of construction and installation materials and equipment on the construction site; hydraulic system of drilling rigs; the influence of soil conditions and terrain on the choice of route and methods of moving the drilling rig; standard projects for organizing workplaces and network planning for the construction of drilling rigs; the procedure for keeping records and reporting on the use of transport and materials; purpose, design and operating rules of vehicles for transporting large blocks.

When installing, dismantling and transporting drilling rigs with a nominal lifting capacity of over 250 tons - 8th category.

Secondary vocational education required.

Resolution of the Ministry of Labor of the Russian Federation dated November 14, 2000 N 81 “On approval of the Unified Tariff and Qualification Directory of Work and Professions of Workers, issue 6, sections: “Drilling wells”, “Oil and gas production”

3. Derrick erector

4th category

Characteristics of the work. Installation, dismantling and transportation of drilling rigs, rig structures, mechanisms for raising and lowering derricks, equipment for the drilling fluid circulation system, a block of spare tanks, a power unit and mechanization and automation equipment. Breakdown of the locations of foundations for drilling equipment and subsurface foundations. Laying and piping of exhaust manifolds for diesel engines, participation in the assembly and crimping of injection lines and manifolds under the guidance of a more highly qualified rigger. Alignment of the drilling rig, drilling, power equipment and individual blocks of the drilling rig. Leading a derrick crew in assembling, moving and disassembling drilling rigs for geological exploration drilling with towers of all types and designs used in geological exploration equipment.

Must know: methods and rules for installation, dismantling and transportation of drilling rigs; design of a mechanization and automation complex; the purpose and technical characteristics of the complex of mechanisms for lowering and lifting operations, mechanisms of the circulation system, communications for steam and water supply, electricity supply, pneumatic systems and heating of workplaces and mechanisms; rules for the production of slinging and rigging works using lifting mechanisms.

0.1. The document comes into force from the moment of approval.

0.2. Document developer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.3. The document has been approved: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.4. Periodic check of this document carried out at intervals not exceeding 3 years.

1. General Provisions

1.1. The position "Digital erector 4th category" belongs to the category "Workers".

1.2. Qualification requirements- vocational and technical education. Training. Work experience in the profession of a 3rd category tower erector - at least 1 year.

1.3. Knows and applies in practice:
- methods and rules for installation, dismantling and transportation of drilling rigs;
- design of the mechanization and automation complex;
- purpose and technical characteristics of the complex of mechanisms for hoisting operations, mechanisms of the circulation system;
- communication diagrams for hot water supply, electricity supply, pneumatic systems and heating of workplaces and mechanisms;
- rules for carrying out slinging and rigging work using lifting mechanisms.

1.4. Appointed to a position and dismissed from a position by order of the organization (enterprise/institution).

1.5. Reports directly to _ _ _ _ _ _ _ _ _ _ .

1.6. Supervises the work of _ _ _ _ _ _ _ _ _ _ .

1.7. During absence, he is replaced by a person appointed to in the prescribed manner, which acquires the corresponding rights and is responsible for the proper fulfillment of the duties assigned to it.

2. Characteristics of work, tasks and job responsibilities

2.1. Carries out installation, dismantling and transportation of drilling rigs, drilling structures, mechanisms for raising and lowering derricks, equipment for the circulation system for cleaning drilling fluid, a block of spare tanks, a power unit and mechanization and automation equipment.

2.2. Breaks down the locations of the foundations of drilling equipment and derrick structures.

2.3. Lays and ties exhaust manifolds for diesel engines, fuel, water and oil lines.

2.4. Pressurizes lines and tanks with pressure from 1.6 MPa to 2.6 MPa (from 1.6 kgf/sq.cm to 26 kgf/sq.cm).

2.5. Centers the derrick, drilling, power equipment and individual units of the drilling rig.

2.6. Carries out the laying of power transmission line supports.

2.7. Supervises the rig team during the assembly, movement and dismantling of drilling rigs with derricks of all types and designs.

2.8. Knows, understands and applies current regulations relating to his activities.

2.9. Knows and complies with the requirements of regulations on labor protection and environment, complies with the standards, methods and techniques of safe work performance.

3. Rights

A 4th category tower erector has the right to:

3.1. Take action to prevent and correct any violations or non-compliances.

3.2. Receive all social guarantees provided for by law.

3.3. Request assistance in fulfilling your job responsibilities and exercise of rights.

3.4. Require the creation of organizational and technical conditions necessary for the performance of official duties and the provision necessary equipment and inventory.

3.5. Get acquainted with draft documents relating to its activities.

3.6. Request and receive documents, materials and information necessary to fulfill their job duties and management orders.

3.7. Improve your professional qualifications.

3.8. Report all violations and inconsistencies identified in the course of its activities and make proposals for their elimination.

3.9. Familiarize yourself with the documents defining the rights and responsibilities of the position held, and the criteria for assessing the quality of performance of official duties.

4. Responsibility

A 4th grade tower erector is responsible for:

4.1. Failure to fulfill or untimely fulfillment of the requirements set forth herein job description obligations and (or) non-use of granted rights.

4.2. Failure to comply with internal labor regulations, labor protection, safety regulations, industrial sanitation and fire protection.

4.3. Disclosure of information about an organization (enterprise/institution) related to a trade secret.

4.4. Failure to comply or improper fulfillment of internal requirements regulatory documents organization (enterprise/institution) and legal orders of management.

4.5. Offenses committed in the course of their activities, within the limits established by the current administrative, criminal and civil legislation.

4.6. Causing material damage organization (enterprise/institution) within the limits established by current administrative, criminal and civil legislation.

4.7. Illegal use of granted official powers, as well as their use for personal purposes.

Unified Tariff and Qualification Directory of Work and Professions of Workers (UTKS). Issue #6
Approved by Resolution of the Ministry of Labor and Social Development of the Russian Federation dated November 14, 2000 N 81

Vyshkomontazhnik

§ 2. Derrick erector of the 3rd category

Characteristics of work. Installation, dismantling and transportation of drilling rig blocks, boiler units, water pumping units, fuel oil units, electric drilling equipment, metal transition platforms, ladders, ladders and fences on power, pumping, energy, derrick and winch units and drilling fluid cleaning systems. Construction of a concrete covering under the drilling rig, bases and platforms for spare tanks and clay mixers, fences for moving parts of mechanisms. Performing excavation, concrete, plumbing, carpentry and loading and unloading work during the assembly and disassembly of towers and superstructures. Installation of anchors for securing and centering the tower. Layout of locations for foundations of drilling equipment and off-site structures under the guidance of a more highly qualified derrick operator. Laying and piping of steam and water lines. Lubrication of drilling and process equipment. Preparing auxiliary equipment for transportation. Assembly, movement and disassembly of drilling rigs for geological exploration drilling with towers of all types and designs.

Must know: purpose of drilling rigs, used mechanisms and equipment; purpose of tower parts and structural units of foundations, foundations and superstructures; dimensions of constructed fences for barns and work sites; methods of installation, dismantling and transportation of drilling rigs; layout of drilling equipment and communications; technical characteristics of mechanisms used in tower construction; placement of instrumentation; rules for using metalwork and carpentry tools; rules for slinging, lifting and moving small cargo; conditional alarm for crane operators.

§ 3. Derrick erector of the 4th category

Characteristics of work. Installation, dismantling and transportation of drilling rigs, rig structures, mechanisms for raising and lowering derricks, equipment for the drilling fluid circulation system, a block of spare tanks, a power unit and mechanization and automation equipment. Breakdown of the locations of foundations for drilling equipment and subsurface foundations. Laying and piping of exhaust manifolds for diesel engines, participation in the assembly and crimping of injection lines and manifolds under the guidance of a more highly qualified rigger. Alignment of the drilling rig, drilling, power equipment and individual blocks of the drilling rig. Leading a derrick crew in assembling, moving and disassembling drilling rigs for geological exploration drilling with towers of all types and designs used in geological exploration equipment.

Must know: methods and rules for installation, dismantling and transportation of drilling rigs; design of a mechanization and automation complex; the purpose and technical characteristics of the complex of mechanisms for lowering and lifting operations, mechanisms of the circulation system, communications for steam and water supply, electricity supply, pneumatic systems and heating of workplaces and mechanisms; rules for the production of slinging and rigging works using lifting mechanisms.

§ 4. Derrick erector of the 5th category

Characteristics of work. Installation and dismantling of: main process equipment, drilling process control panels, rotary cranes, metal frames for covering drilling rig blocks, automatic lowering and lifting of drilling tools, automation equipment; tire-pneumatic couplings; A-shaped derricks and tower-type derricks up to 45 m high. Lifting and installation of individual blocks of the drilling rig, drilling and power equipment on the foundation. Docking of blocks using lifting and transport vehicles. Assembly and crimping of injection lines and manifolds with pressure up to 15 MPa (150 kgf/sq. cm). Power transmission alignment. Reactivation and testing of drilling equipment and drilling rigs. Management of the rig crew during installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of up to 100 tons.

Must know: industrial methods for constructing drilling rigs of all types; design of drilling rigs, drilling equipment, mechanisms used during their installation and dismantling; communication diagrams of high and low pressure pipelines, fuel system, instrumentation and equipment; methods of installation and dismantling of tire-pneumatic couplings; methods of alignment and testing of the equipment used and the drilling rig; basic rules for the production of electric welding, electrical installation, slinging and rigging works; purpose of hydrocyclone and degassing installations; types of vehicles for transporting large blocks.

§ 5. Derrick erector of the 6th category

Characteristics of work. Acceptance of the drilling rig for installation and commissioning after installation. Installation and dismantling of A-frame towers and tower type towers. Assembly and pressure testing of injection lines and manifolds with pressures from over 15 MPa to 30 MPa (over 150 kgf/sq. cm to 300 kgf/sq. cm). Linking the standard layout of drilling rig equipment to terrain conditions. Selecting a route for transporting drilling rig blocks. Placement according to the diagram of drilling equipment, transport and lifting equipment and materials. Travel system equipment. Test launch of the drilling rig. Preparation of relevant documentation for the drilling rig. Management of the rig crew during the installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of over 100 tons up to and including 200 tons.

Must know: the procedure for accepting the drilling rig for installation and putting it into operation after installation; layout diagrams of drilling rig equipment, rational arrangement of construction and installation equipment on the construction site; the influence of soil conditions and terrain on the choice of route and methods of moving the drilling rig; hydraulic system of drilling rigs; standard projects for organizing workplaces and network planning for the construction of drilling rigs; purpose, design and operating rules of vehicles for transporting large blocks.

§ 6. Derrick erector of the 7th category

Characteristics of work. Acceptance of the drilling rig for installation and commissioning after installation. Installation and dismantling of A-shaped towers, tower-type towers and complex structures with a height of over 45 m. Assembly and pressure testing of injection lines and manifolds with a pressure of over 30 MPa (over 300 kgf/sq. cm). Linking the standard layout of drilling rig equipment to terrain conditions. Selecting a route for transporting drilling rig blocks. Placement according to the diagram of drilling equipment, transport and lifting equipment and materials. Travel system equipment. Test launch of the drilling rig. Preparation of relevant documentation for the drilling rig. Management of the rig crew during the installation, dismantling and transportation of drilling rigs with a nominal lifting capacity of over 200 tons up to and including 250 tons.

Must know: the procedure for accepting the drilling rig for installation and putting it into operation after installation; layout diagrams of drilling rig equipment, rational arrangement of construction and installation materials and equipment on the construction site; hydraulic system of drilling rigs; the influence of soil conditions and terrain on the choice of route and methods of moving the drilling rig; standard projects for organizing workplaces and network planning for the construction of drilling rigs; the procedure for keeping records and reporting on the use of transport and materials; purpose, design and operating rules of vehicles for transporting large blocks.

When installing, dismantling and transporting drilling rigs with a nominal lifting capacity of over 250 tons - 8th category.

Secondary vocational education required.

This job description has been automatically translated. Please note that automatic translation is not 100% accurate, so there may be minor translation errors in the text.

Preface to the job description

0.1. The document comes into force from the moment of approval.

0.2. Document developer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.3. The document has been approved: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.4. Periodic verification of this document is carried out at intervals not exceeding 3 years.

1. General Provisions

1.1. The position "Digital erector 4th category" belongs to the category "Workers".

1.2. Qualification requirements: vocational and technical education. Training. Work experience in the profession of a 3rd category tower erector - at least 1 year.

1.3. Knows and applies in practice:
- methods and rules for installation, dismantling and transportation of drilling rigs;
- design of the mechanization and automation complex;
- purpose and technical characteristics of the complex of mechanisms for hoisting operations, mechanisms of the circulation system;
- communication diagrams for hot water supply, electricity supply, pneumatic systems and heating of workplaces and mechanisms;
- rules for carrying out slinging and rigging work using lifting mechanisms.

1.4. A 4th grade tower erector is appointed to a position and dismissed from a position by order of the organization (enterprise/institution).

1.5. A 4th grade tower erector reports directly to _ _ _ _ _ _ _ _ _ _ .

1.6. A 4th grade tower erector supervises the work of _ _ _ _ _ _ _ _ _ _ .

1.7. During his absence, a 4th grade tower erector is replaced by a person appointed in accordance with the established procedure, who acquires the appropriate rights and is responsible for the proper performance of the duties assigned to him.

2. Characteristics of work, tasks and job responsibilities

2.1. Carries out installation, dismantling and transportation of drilling rigs, drilling structures, mechanisms for raising and lowering derricks, equipment for the circulation system for cleaning drilling fluid, a block of spare tanks, a power unit and mechanization and automation equipment.

2.2. Breaks down the locations of the foundations of drilling equipment and derrick structures.

2.3. Lays and ties exhaust manifolds for diesel engines, fuel, water and oil lines.

2.4. Pressurizes lines and tanks with pressure from 1.6 MPa to 2.6 MPa (from 1.6 kgf/sq.cm to 26 kgf/sq.cm).

2.5. Centers the derrick, drilling, power equipment and individual units of the drilling rig.

2.6. Carries out the laying of power transmission line supports.

2.7. Supervises the rig team during the assembly, movement and dismantling of drilling rigs with derricks of all types and designs.

2.8. Knows, understands and applies current regulations relating to his activities.

2.9. Knows and complies with the requirements of regulations on labor protection and environmental protection, complies with the norms, methods and techniques for the safe performance of work.

3. Rights

3.1. A 4th grade scaffolder has the right to take action to prevent and eliminate cases of any violations or inconsistencies.

3.2. A 4th category tower erector has the right to receive all social guarantees provided for by law.

3.3. A 4th category tower erector has the right to demand assistance in the performance of his official duties and the exercise of his rights.

3.4. A 4th category tower erector has the right to demand the creation of organizational and technical conditions necessary for the performance of official duties and the provision of the necessary equipment and inventory.

3.5. A 4th category tower erector has the right to get acquainted with draft documents relating to his activities.

3.6. A 4th category tower erector has the right to request and receive documents, materials and information necessary to perform his job duties and management orders.

3.7. A 4th category tower assembler has the right to improve his professional qualifications.

3.8. A 4th category tower erector has the right to report all violations and inconsistencies identified in the course of his activities and make proposals for their elimination.

3.9. A 4th category tower erector has the right to familiarize himself with documents defining the rights and responsibilities of his position, and criteria for assessing the quality of performance of official duties.

4. Responsibility

4.1. A 4th category tower erector is responsible for failure to fulfill or untimely fulfillment of the duties assigned by this job description and (or) failure to use the granted rights.

4.2. A 4th category tower erector is responsible for failure to comply with internal labor regulations, labor protection, safety regulations, industrial sanitation and fire protection.

4.3. A 4th category tower erector is responsible for disclosing information about an organization (enterprise/institution) that is a trade secret.

4.4. A 4th category tower erector is responsible for non-fulfillment or improper fulfillment of the requirements of internal regulatory documents of the organization (enterprise/institution) and legal orders of management.

4.5. A 4th category tower erector is responsible for offenses committed in the course of his activities, within the limits established by the current administrative, criminal and civil legislation.

4.6. A 4th category tower erector is responsible for causing material damage to an organization (enterprise/institution) within the limits established by current administrative, criminal and civil legislation.

4.7. A 4th category tower erector is responsible for the unlawful use of granted official powers, as well as their use for personal purposes.

Share